Engineering > Meeting Records
CY-2004 Meetings

Note:

Documentation is organized by meeting month and day.

 

The relevant WBS is in parentheses - (6) means WBS 6 in our shorthand notation.

(SIT) indicates a Systems Integration Team meeting.

(CS) indicates a monthly Cost and Schedule Review.

(WRD) indicates a Winding R&D meeting.

(Engr) indicates a project-wide Engineering meeting.

(Matl) indicates a materials test meeting.

(CA) indicates a Critical Activities status meeting

Other entries are self-explanatory.

 

Records from IPT and Project meetings are posted on the Project Web.

January  5(SIT) 7(1) 12(SIT) 14(1) 19(SIT) 21(1) 26(SIT)
February 4(1) 9(SIT) 10(12) 16(SIT) 18(1) 20(142) 23(SIT) 25(14)
March 3(14) 3(1) 8(SIT) 8(Matl) 10(1) 15(SIT) 15(Matl) 17(1) 19(Seismic) 22(Matl) 22(SIT) 24(1) 29(Seismic)
April 1(13) 2(SIT) 5(Matl) 12(SIT) 12(Matl) 26(SIT)  27(MC Cooling)
May 24(SIT)
June 2(Matl) 10(MC Cooling) 14(SIT) 21(Matl) 23(1) 28(SIT) 30(1)
July 7(1) 12(SIT) 14(1) 19(SIT) 21(TF) 22(MC Winding) 26(SIT) 28(1)
August 5(DC Xmission) 9(CA) 9(SIT) 10(Maul Electric) 18(1) 23(SIT) 25(1)
September 15(1) 20(SIT) 27(SIT)
October 4(Matl) 6(CS) 7-11(Planning) 11(CA) 13(Status Review) 14(13) 14(14) 15(ACC) 15(TRC FDR) 18(CA) 18(SIT) 19(Planning) 25(CA) 25(SIT)
November 1(CA) 8(CA) 8(SIT) 10(1) 15(CA) 15(SIT) 17(1) 29(SIT)
December 6(CA) 13(CA) 15(Project) 20(CA) 20(SIT)