NCSX Web Pages  

Project | Management | Physics | Procurement | Manufacturing

NCSX FTP Sites  

Project FTP Server | Supplier FTP Server

Navigation Trail  

Engineering > Meeting Records
CY-2006 Meetings

Note:

Documentation is organized by meeting month and day.

 

The relevant WBS is in parentheses - (6) means WBS 6 in our shorthand notation.

(SIT) indicates a Systems Integration Team meeting.

(CS) indicates a monthly Cost and Schedule Review.

(WRD) indicates a Winding R&D meeting.

(Engr) indicates a project-wide Engineering meeting.

(Matl) indicates a materials test meeting.

(CA) indicates a Critical Activities status meeting

(PS) indicates the weekly Project Status telecon

(CCB) indicates a Change Control Board meeting

(TRC) indicates a meeting on the Twisted Racetrack Coil

Other entries are self-explanatory.

(OFES) indicates a meeting with OFES.

(FPA) indicates Field Period Assembly.

(DC) indicates Dimensional Control

(MC) indicates Modular Coil

(OSF) indicates On-site Fabrication

 

Records from IPT and Project meetings are posted on the Project Web.

January 

3(SIT) 5(82) 9(FPA) 11(FPA) 11(PS) 12(171) 16(MCF) 16(FPA)

16(SIT) 18(PS) 23(MCF) 23(FPA) 25(DC) 25(PS) 30(SIT)

February

6(MCF) 6(FPA) 9(14) 13(FPA) 13(SIT) 20(14) 20(FPA) 27(14) 27(FPA) 27(SIT)

March

3(CS) 8(PS) 13(FPA) 13(SIT) 14(17) 15(16) 15(PS) 22(PS) 20(12) 

27(MCF/FPA) 27(SIT)

April

5(PS) 5(CS) 10(MCF/FPA) 15(PS) 17(SIT) 19(PS)

May

8(SIT) 10(PS) 12(Engr) 17(PS) 17(14) 22(MCF/FPA) 22(SIT) 22(14)

24(PS) 31(PS)

June

14(PS) 19(SIT) 21(PS) 26(SIT) 28(PS)

July

5(PS) 7(CS) 10(SIT) 12(PS) 14(14) 17(MC/FPA) 19(PS) 24(SIT)

24(MC/FPA) 25(OSF) 27(14) 31(MC/FPA)

August

2(18) 3(PS) 7(MC/FPA) 7(SIT) 8(CS) 8(OSF) 9(PS) 14(MC/FPA)

15(OSF) 16(PS) 21(MC/FPA) 22(SIT) 23(PS) 28(MC/FPA) 30(PS)

31(FPA)

September 5(MC/FPA) 11(MC/FPA) 13(PS) 18(MC/FPA) 19(OSF) 19(DOE) 20(14) 20(PS) 25(MC/FPA) 27(14)
October 2(MC/FPA) 16(MC/FPA) 25(PS) 30(MC/FPA)
November 2(14) 6(MC/FPA)
December 18(Engr)
 
 
 
 
 
 

Privacy and Security Notice

Please forward comments and questions to the Webmaster