Note:
Documentation
is organized by meeting month and day.
The
relevant WBS is in parentheses - (6)
means WBS 6 in our shorthand notation.
(SIT) indicates a Systems
Integration Team meeting.
(CS) indicates a monthly Cost and Schedule Review.
(WRD)
indicates a Winding R&D meeting.
(Engr)
indicates a project-wide Engineering meeting.
(Matl) indicates a materials
test meeting.
(CA) indicates a Critical
Activities status meeting
(PS) indicates the weekly
Project Status telecon
(CCB) indicates a Change
Control Board meeting
(TRC) indicates a meeting on
the Twisted Racetrack Coil
Other entries are
self-explanatory.
(OFES) indicates a meeting
with OFES.
(FPA) indicates Field Period
Assembly.
(DC) indicates Dimensional
Control
(MC) indicates Modular Coil
(OSF) indicates On-site
Fabrication
Records
from IPT and Project meetings are posted on the Project Web.
|